Transport Plans and Strategies
North Area Access Strategy
North Area Access Study
Phase 1
The results of the NAAS consultation, held in April 2005 has been published and its findings and recommendation have been endorsed by Cabinet. The views of the 1138 people who responded to the consultation have been considered as part of the evaluation process and as a result some draft proposals have been removed from the study and some new proposals added.
The recommendations, contained in the Cabinet report, for the next phase of the study reflect the 3 top priorities which emerge from the consultation:
Reducing congestion and delays (71%)
Better Public transport (53%)
Improved Safety for pedestrians and cyclists (50%)
The proposal have also been analysed by Officers and grouped into deliverable, short, medium and long term packages. These packages of measures will be progressed as part of Reading's ongoing Horizons transport strategy, and work to develop them will begin immediately.
If you require further information, please use the contact form, which is available on the right-hand side at the top of this page.
Phase 2 of the Study
This newsletter introduces the ideas for Phase 2 of the LAE, which covers Caversham Park Road and Lowfield Road. These proposals aim to reflect concerns raised by local residents.
Please take time to have a look at the attached leaflet. If you have any comments please use the website contacts form.
Please select link below for the full document.
Downloads
| File | Type | Size | Download Time |
|---|---|---|---|
| NAAS Consultation Cabinet Report | 353 KB | 56Kbps Modem: 1 Minute Broadband : 7 Seconds |
|
| The North Area Consultation Study Leaflet | 1,197 KB | 56Kbps Modem: 5 Minutes Broadband : 24 Seconds |
|
| NAAS Full Consultation Report | 2,791 KB | 56Kbps Modem: 11 Minutes Broadband : 57 Seconds |
|
| Phase 2 of the NAAS | 3,412 KB | 56Kbps Modem: 14 Minutes Broadband : 1 Minute |